US-31 Construction/Closure- South of “Big Mac”

Home Forums BMWRA International Rally Info Previous years… 2017 Rally – Petoskey, MI US-31 Construction/Closure- South of “Big Mac”

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #59699
    ALEXANDER ROBERT
    Spectator

    Riders from “Da North”

    For those that are planning to head south across “Big Mac” to head to the rally, there is a construction zone/closure on US-31 about 15 miles south of the Mackinac Bridge at the town of Levering. 

    For  those heading directly to rally site from the bridge, Continue south on I-75 to the “Indian River” exit.  Head west to Alanson, where you’ll join back to US-31 & then south on to Petoskey.  For those wanting to ride the “Tunnel of Trees” on their way to the Rally, continue south from the bridage on US-31 to Levering.  Then follow direction west to Cross Village and head south on M-119 to Harbor Springs thru the “tunnel”.  Petoskey is only 8 miles from Harbor Springs.

    #64500
    POLAND SIBLEY
    Spectator

    We plan to hop on over to the West Coast to N Lake Shore aka Tunnel of Trees Road and take the scenic route! Thanks for the heads up on 31 though. See everyone soon!

    #64503
    GEHLER JEFFREY
    Spectator

    Just watch  holiday trafic.  this route misses  contruction

    ​off interstate 75,  Hwy 31,  E. Gill Road,  W.Lakeview Rd.,  N. Lake Shore Dr.  119  

    nice ride but some narrow roads 